A hydrographical and water quality study during the construction of second Hampton Roads bridge-tunnel

Neilson, Bruce J.
Fang, C. S.
Abstract
In 1972 studies were conducted to determine the environmental impact of a third crossing of Hampton Roads, a bridge-tunnel connection designated as part of Interstate Highway 664. At the same time, construction had begun for a second bridge and tunnel to parallel the existing Hampton Roads Bridge-Tunnel which was to be incorporated into the Interstate system as I-64. Because this project was only in the initial stages, it was recommended that an evaluation of I-64 be made in order to make recommendations for the design of and construction methods for the I-664 bridge-tunnel. This study deals with the water quality impact of I-64 construction activities and modifications to the circulation due to tunnel islands. The proposed alignment of I-664 and the existing I-64 corridor are shown in Figure 1.
Description
Date
1975
Journal Title
Journal ISSN
Volume Title
Publisher
Download Dataset
Rights Holder
Usage License
Embargo
Research Projects
Organizational Units
Journal Issue
Keywords
Research and Technical Reports, Water quality -- Virginia -- Hampton Roads (Harbor)
Citation
Advisor
Department
Virginia Institute of Marine Science
DOI
Embedded videos