Loading...
Thumbnail Image
Publication

Plume monitoring of Rappahannock and York spit channels, Baltimore Harbor and channels: Phase II, York spit channel

Nichols, M.
Diaz, R. J.
Abstract
This report provides new data acquired by monitoring of hopper dredging operations at the York Spit Channel in southern Chesapeake Bay. Turbidity was measured and acoustical sensing was performed from a vessel tracking through the plumes while water samples were obtained at fixed stations for analyses of salinity and total suspended sediment concentrations. Other parameters include temperature and thickness of deposited layers. The plumes were monitored June 14, 1988 for 8.5 hours and six dredging cycles along the channel length. Most of the dredged material is silty sand. Normal background concentrations before dredging are in the range 2.6 to 17 mg/1.
Description
Date
1989
Journal Title
Journal ISSN
Volume Title
Publisher
Download Dataset
Rights Holder
Usage License
Embargo
Research Projects
Organizational Units
Journal Issue
Keywords
Research and Technical Reports, Suspended sediments -- Chesapeake Bay (Md. and Va.) -- Measurement, Dredging -- Environmental aspects -- Chesapeake Bay (Md. and Va.
Citation
Advisor
Department
Virginia Institute of Marine Science
DOI
Embedded videos